[email protected]  |  (810) 844-0233

Search

Rebuilt Pines #3 Hydraulic Tube Bender Sample

MANUFACTURER: Pines
MODEL: #3
CONDITION: Refurbished

Rebuild YOUR PINES #3 Hydraulic Tube Bender To Include:

• Bender is upgraded with a Current Tech CAB digital control

• Machine cleaned, sanded & painted. Color Machine (Your Choice) & Safety Yellow or Safety Orange

• Swing Arm:
1. Removed & inspected
2. Repair bend die keyway (If necessary)
3. Repair pin holes (If necessary)
4. Replace spindle (If necessary)
5. Skim cut bend die mounting surface (If necessary)
6. Remove & replace cup & cone spindle bearings
7. Replace spanner nuts with (1) standard & (1) Taperline locking style
8. Replace spindle key
9. Replace fasteners
10. Replace bushings in the spindle for split die actuator
11. New die post for split die actuator
12. New Steel Slide w/Phenolic Wear Strips
13. New Slide Wipers
14. New Brass Slide Guards on Clamp Bars
15. New Phenolic Top Wear Strips
16. New Bronze Gib
17. New Clamp Bars & Fasteners
18. New Clamp Cylinder
19. New Rod End
20. New Pins – Upper Rear, Rod End, Slide & Clevis
21. New Toggle Links
22. New Bend Die Key

• Stationary Arm:
1. Inspected (Existing arm is welded to the bender)
2. Repair Pin Holes (If necessary)
3. Replace fasteners
4. New Steel Slide w/Phenolic Wear Strips
5. New Slide Wipers
6. New Brass Slide Guards on Clamp Bars
7. New Phenolic Top Wear Strips
8. New Bronze Gib
9. New Clamp Bars & Fasteners
10. New Clamp Cylinder
11. New Rod End
12. New Pins – Upper Rear, Rod End, Slide & Clevis

• Split Die Actuator – Undernose
1. R & R Toggle Link Bushings
2. R & R Toggle Pins
3. Rebuild Existing Split Die Cylinder

• NEW Hydraulic cylinders
1. Bend
2. Clamp
3. Pressure Die Clamp
4. Pressure Die Assist

• Hydraulics All New:
5. New STEEL Hydraulic Manifold
6. Vickers Bend Valve (PA5 Connector) & Flow Control
7. Vickers Clamp Valve (PA5 Connector) & Flow Control
8. Vickers Pressure Die Clamp Valve (PA5 Connector) & Flow Control
9. Vickers Mandrel (Block off plate) No Valve mounted.
10. Vickers Split Die Sequence & PO Check Valve (PA5 Connection)
11. Vickers Piston Pump
12. The suction strainer, oil sight glass & pressure gauges are replaced
13. New Steel Lines

• New Parker hydraulic hoses & fittings

• New gaskets on side oil tank covers

• New Lube USA electronic slide lubricator. Includes new junctions, meters, line, ferrules, & fittings.

• New main electric motor (TEFC) Totally Enclosed Fan Cooled (C-Faced)

• Electrical:
1. New disconnect box (Need Voltage)
2. New fused disconnect switch
3. New motor starter
4. New transformer
5. New wireway
6. New wiring
7. New prox. Switches, Mounting Brackets & Cords
8. New Safety Plate Plunger Switches
9. New Bend Overtravel Lever Switch
10. New fittings
11. New Fuses

• New Rear Sprocket pin & bushing

• New Front 200-2 & Rear 120 bend chain & connecting links

• Sprockets inspected and quoted extra if necessary.

• New Safety Plate Springs and Fasteners

• New Pressure Die Assist Assembly (PDA) – Linear Rail & Bearing Style
1. New Master Bar Assembly
2. Remove Existing Booster Assembly

• New Clamp Die Holder Assembly

• Remove Overhead Tie Bar Assembly

• Machine cycled & tested. Sample material & a set of tooling are required to be provided by customer.

Fill out the form below for information about this product: